Contact Page 
Commercial GRP fibreglass roofing
Commercial GRP fibreglass roofing

Commercial GRP Fiberglass Roofing. 

Commercial GRP Fiberglass Roofing. 
Asked to stop multiple leaks on a flat roof in North Devon, the office area below had to be kept in working use, so it was opted to over board.
Asked to stop multiple leaks on a flat roof in North Devon. The working area below had to be kept in working use, so it was opted to over board. 
To save time on site all boards received one layer of glass off site, once installed all joints received two layers on the joints and a full layer of resin and glass over the top by MJS Building Maintenance Ltd.
To save time on site, all boards received one layer of glass off site. Once installed all joints received two layers on the joints and a full layer of resin and glass over the top. 
Up stands were made to box in old ventilation outlets, due to not being able to disturb the working area below North Devon Office
Up stands were made to box in old ventilation outlets due to not being able to disturb the working area below. 
The make up was baton 18mm board two layer of fiberglass and matting, GRP trims on all external edges with spacing's to allow roof to breath in Devon
The make up was baton 18mm board 2 layer of fiberglass and matting GRP trims on all external edges with spacing's to allow roof to breath. 
Preformed customised fiberglass outlets to fit into the internal guttering. A project in North Devon
Preformed outlets to fit into the internal guttering. 
All boxed up stands were glassed in place as part of fiberglass flat roof repair in North Devon
All boxed up stands were glassed in place. 
Safety measures put in place, a Key clamp hand rail installed around the outside to prevent falling, also a scaffolding crash deck in North Devon.
Key clamp hand rail installed around the outside to prevent falling there was also a scaffolding crash deck. 
340m2 roof fiber-glassed and water tight in three weeks.   the Gel coat was later applied in sections to allow for moving around air units and other obstacles on the roof.  This was a very challenging project and by far not easy to complete with weather conditions and restriction on site, however the customer was happy the factory could continue throughout the working process. All work carried out by MJS Building Maintenance LTD.
340 square metres of roof fiber-glassed and water tight in three weeks. The Gel coat was later applied in sections to allow for relocating air units and other obstacles on the roof. This was a very challenging project and by far not easy to complete with weather conditions and restricted access on site, however the customer was happy the factory could function as usual throughout the working process. All work carried out by MJS Building Maintenance LTD. Roofing Services  
GRP fibreglass roof office block North Devon
If you are interested to find out more you can contact MJS Building Maintenance by using the contact page  
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings