Flood Prevention Works
Flood Prevention Works North Devon
MJS Building Maintenance Ltd. project managing water diversion works, working with the local environmental agency.
River bank excavated down to existing level of the river bed, with all spoils removed from the site, then began installing the gabion baskets.
Gabion baskets were installed on solid rock base and back filled with stone and topped with soil.
Two layers of gabion baskets were installed and back filled, this was to divert the water from its natural course, to avoid potential flooding of a North Devon Factory.