Campsite Shower Block Refurbishment.
Campsite Shower Block Refurbishment.
Stripped out original plumbing and vanity units ready to install new worktops and sinks.
Walls clad with white easy clean hygiene boarding. New plumbing pipe work fitted under worktops with sinks mounted on top and taps installed.
Originally the block had showers only. Concrete floor broken up and dug out to install the new plumbing for drainage and water supply to feed 12 new toilets. Once the pipework completed screeded the floors and applied a non slip flooring.
NIC registered electrician installed electrical heaters and heater guards.
All woodwork decorated, (colour chosen by client) rubbed down then given a coat of primer followed by two coats of high gloss paint.
The finished vanity area, all joints sealed for easy cleaning, the photograph above the female shower/toilet block, the male block has shaver points added beside the mirrors. All works completed by MJS Building Maintenance Ltd, for a local campsite in North Devon.