Mezzanine Floor Installation
Mezzanine floor created for more storage
MJS Building Maintenance LTD installing goal post steel frames to support new joists.
Steels safely lifted in to position using a pair of Heavy-duty Genie lifts then bolted together.
Steels in place ready for joists.
Joists installed at 400mm centres and noggings at either end.
Joists trimmed out for the staircase.
Timber joists notched into steels for support.
4x1 timber laid over joists and fixed.
Full width floor taking place
Mezzanine access
Timber hand rails in place.
Building stairs. The stairs were hand made and over engineered due to the heavy constant usage.
Stairs to ground floor complete.
Mezzanine floor installation to increase space for additional storage, work carried out while business open, with a tight completion time. All works were carried out and managed by MJS Building Maintenance Ltd.
If you are interested to find out more you can contact MJS Building Maintenance by using the contact page