Detached Large Garage with Pitched Roof
Detached large garage with pitched roof North Devon
![Old garage removed, site leveled graded and hardcore layed. External shuttering installed using laser level. Barnstaple North Devon](../../../_webedit/cached-images/569.jpg)
Old garage removed, site leveled graded and hardcore layed. External shuttering installed using laser level.
![Garage foundation preparation, Visqueen damp proof membrane layed on sand bed. Concrete mesh installed and tied to form full sized sheet. North Devon](../../../_webedit/cached-images/571.jpg)
Garage foundation preparation, Visqueen damp proof membrane layed on sand bed. Concrete mesh installed and tied to form full sized sheet.
![Garage concrete floor poured and tamp finish North Devon](../../../_webedit/cached-images/572.jpg)
Garage concrete floor poured and tamp finish
![Garage block walls construction, 225mm block pillar construction on main openings and central pillars. North Devon](../../../_webedit/cached-images/573.jpg)
Garage block walls construction, 225mm block pillar construction on main openings and central pillars.
![Garage lintel installed for entrance North Devon](../../../_webedit/cached-images/574.jpg)
Garage lintel installed for entrance
![Garage window and door apertures all face pointed block work. North Devon](../../../_webedit/cached-images/588.jpg)
Garage window and door apertures all face pointed block work.
![Garage roof trusses in place, cross braces installed. North Devon](../../../_webedit/cached-images/576.jpg)
Garage roof trusses in place, cross braces installed.
![Garage roof trusses installed, first gable end build to full hight. North Devon](../../../_webedit/cached-images/577.jpg)
Garage roof trusses installed, first gable end build to full hight.
![Garage progress over view North Devon](../../../_webedit/cached-images/578.jpg)
Garage progress over view
![Garage roof truss construction completes, window installed. North Devon](../../../_webedit/cached-images/579.jpg)
Garage roof truss construction completes, window installed.
![Garage roof construction finshed with UPVC pvc fascia boards. North Devon](../../../_webedit/cached-images/580.jpg)
Garage roof construction finshed with UPVC pvc fascia boards.
![Garage roof gable end block work completed, North Devon](../../../_webedit/cached-images/581.jpg)
Garage roof gable end block work completed.
![External walls scratch coated and rendered, roof felt and battened. North Devon](../../../_webedit/cached-images/582.jpg)
External walls scratch coated and rendered, roof felt and battened.
![Dry Verge being installed on new tiles and battons, North Devon](../../../_webedit/cached-images/583.jpg)
Dry Verge being installed on new tiles and battons
![Completed dry ridge installed all Dry Verge, compleated on new Marly Modern roof tiles, North Devon](../../../_webedit/cached-images/584.jpg)
Completed dry ridge installed all Dry Verge, compleated on new Marly Modern roof tiles
Have a look at our Garage Services for more information
![Detached garage constrcution tiling completed North Devon](../../../_webedit/cached-images/585.jpg)
Project undertaken and managed By MJS Building Maintenance Ltd. from demolition to completion of project. Project kept within budget and completed on time, working to a pre agreed schedule.